{"id":2436,"date":"2015-05-05T02:44:55","date_gmt":"2015-05-05T02:44:55","guid":{"rendered":"https:\/\/ryecivicleague.org\/?p=2436"},"modified":"2024-06-20T05:25:21","modified_gmt":"2024-06-20T05:25:21","slug":"rcl-rye-water-district-april-1-2015-meeting-notes","status":"publish","type":"post","link":"https:\/\/ryecivicleague.org\/?p=2436","title":{"rendered":"RCL  Rye Water District April 1, 2015 meeting notes"},"content":{"rendered":"<p><!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\"><br \/>\n<html><body><\/p>\n<p>1. &Acirc;&nbsp;General discussion and review and revision of March minutes (0:00 elapsed)<br \/>\n2. &Acirc;&nbsp;Former Commissioner John Murtagh arrives. &Acirc;&nbsp;No water main breaks on Ocean Blvd. over the winter. &Acirc;&nbsp;One on Harbor Rd. &Acirc;&nbsp;The State is going after the bond of Hugo Key, contractor for the water main project, due to some sort of issue. (1:28:02 elapsed)<\/p>\n<p>3. &Acirc;&nbsp;Brian Goetz of Portsmouth Water and Sewer Dept. arrives. &Acirc;&nbsp;Wright Pierce will be doing a study of water blending between Rye and Portsmouth to determine effects of mixing water of different pH, hardness, total dissolved solids, and alkalinity. &Acirc;&nbsp;Discussion of issues arising when Sagamore bridge was out and Rye supplied water to Portsmouth. &Acirc;&nbsp;Discussion of existing Portsmouth water treatment plant and potential Rye water treatment plant. (1:44:50 elapsed)<\/p>\n<p>4. &Acirc;&nbsp;Brian Goetz is unsure whether ten house development on Breakfast Hill &Acirc;&nbsp;(to be supplied by Portsmouth Water with water from Rye) will proceed. &Acirc;&nbsp;It appears that a group associated with the Coakley landfill will pay for the cost of the mains. &Acirc;&nbsp;(2:02:00 elapsed)<\/p>\n<p>5. &Acirc;&nbsp;General discussion of new pump shaft and other issues after Mr. Goetz left (2:11:32 elapsed)<\/p>\n<p><\/body><\/html><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. &Acirc;&nbsp;General discussion and review and revision of March minutes (0:00 elapsed) 2. &Acirc;&nbsp;Former Commissioner John Murtagh arrives. &Acirc;&nbsp;No water main breaks on Ocean Blvd. over the winter. &Acirc;&nbsp;One on Harbor Rd. &Acirc;&nbsp;The State is going after the bond of Hugo Key, contractor for the water main project, due to some sort of issue. (1:28:02 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[],"class_list":["post-2436","post","type-post","status-publish","format-standard","hentry","category-town-meetings"],"_links":{"self":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2436"}],"version-history":[{"count":4,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2436\/revisions"}],"predecessor-version":[{"id":2438,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2436\/revisions\/2438"}],"wp:attachment":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}