{"id":2781,"date":"2016-01-03T23:31:15","date_gmt":"2016-01-03T23:31:15","guid":{"rendered":"https:\/\/ryecivicleague.org\/?p=2781"},"modified":"2024-06-20T05:25:21","modified_gmt":"2024-06-20T05:25:21","slug":"town-hall-committee-december-8-2015-rcl-notes","status":"publish","type":"post","link":"https:\/\/ryecivicleague.org\/?p=2781","title":{"rendered":"Town Hall Committee December 8, 2015 RCL Notes"},"content":{"rendered":"<p><!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\"><br \/>\n<html><body><\/p>\n<p>Document for the Civic News: &Acirc;&nbsp;<a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm\">RyeTHCnotes120815revCfinal<\/a>\n<\/p>\n<ol>\n<li>The scope of work for the architect under the pending warrant article was agreed to.&Acirc;&nbsp; Cost estimates and designs are to be generated for five different options. <a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#subcommittee\">More Information<\/a><\/li>\n<li>The fifth option, which would involve spending approximately $500,000 to acquire the parcel just north of the Public Safety Building, may be moot as it may be sold before a decision is reached. <a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#acquisition\">More Information<\/a><\/li>\n<li>After a Committee member expressed disappointment with the 11<sup>th<\/sup> hour identification of structural issues with the Town Hall by the architect, Selectman Musselman acknowledged that a study three years earlier should have identified the issue, but only $5000 of $40,000 voted on Town Hall in 2011 was spent on structural rather than space needs issues.&Acirc;&nbsp;<a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#structural\"> More Information<\/a><\/li>\n<li>Members of the public expressing a view were unanimous in faulting the Committee for a lack of space needs and budget parameters, and argued that the Town was unwilling to spend significantly more than $2 million.&Acirc;&nbsp; <a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#public\">More Information<\/a><\/li>\n<li>A resident argued that the Town Hall would be a tough sale as the Town had been sold a &acirc;&euro;&oelig;bill of goods&acirc;&euro; on the Public Safety Building.&Acirc;&nbsp; <a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#jarvis\">More Information<\/a><\/li>\n<li>Selectman Musselman stated that all five options are leading to a $2.5 million to $3 million cost, and stated that they would need to work with the architect to get the 8000-9000 sq. ft. building constructed for that.&Acirc;&nbsp; <a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2016\/01\/RyeTHCnotes120815revCfinal.htm#musselman\">More Information<\/a><\/li>\n<\/ol>\n<p>&nbsp;<\/body><\/html><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Document for the Civic News: &Acirc;&nbsp;RyeTHCnotes120815revCfinal The scope of work for the architect under the pending warrant article was agreed to.&Acirc;&nbsp; Cost estimates and designs are to be generated for five different options. More Information The fifth option, which would involve spending approximately $500,000 to acquire the parcel just north of the Public Safety Building, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,6],"tags":[],"class_list":["post-2781","post","type-post","status-publish","format-standard","hentry","category-committee-mtgs","category-town-hall-renovations"],"_links":{"self":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2781"}],"version-history":[{"count":4,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2781\/revisions"}],"predecessor-version":[{"id":2783,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/2781\/revisions\/2783"}],"wp:attachment":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}