{"id":3938,"date":"2017-10-28T13:24:09","date_gmt":"2017-10-28T13:24:09","guid":{"rendered":"https:\/\/ryecivicleague.org\/?p=3938"},"modified":"2024-06-20T05:25:20","modified_gmt":"2024-06-20T05:25:20","slug":"town-hall-space-2017-updates","status":"publish","type":"post","link":"https:\/\/ryecivicleague.org\/?p=3938","title":{"rendered":"Town Hall Space 2017 Updates"},"content":{"rendered":"<p><!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\"><br \/>\n<html><body><\/p>\n<p>The Heritage Committee continues to do all it can to raise funds to maintain the building.&Acirc;&nbsp; The BOS is completing construction on the back entrance.<\/p>\n<p>Updated Public Safety Building Space:&Acirc;&nbsp;&Acirc;&nbsp;<a href=\"https:\/\/ryecivicleague.org\/wp-content\/uploads\/2017\/10\/Rye-Public-Safety-Building-Available-Space.pdf\">Rye Public Safety Building Available Space<\/a><\/p>\n<p>Updates on the private design for a new build for Town Hall:&Acirc;&nbsp; <a href=\"http:\/\/www.ryetownhalloption3.com\/\">Click Here<\/a><\/p>\n<p><strong>Note from John Loftus:<\/strong><\/p>\n<p>Dear Rye Voters,\n<\/p>\n<div><\/div>\n<div>The drawings for a New Rye Town Hall are 97% completed.&Acirc;&nbsp; We are still fine tuning some details, nonetheless, they give a good visual representation both in elevation and (floor) plan prospective.&Acirc;&nbsp; I am working with Rob Schaeffer, A.I.A., of David White Architects, who has taken my design input and entered into CAD, while reviewing code issues.<\/div>\n<div><\/div>\n<div>During this period of introspection, and discussion, with the actual people &Acirc;&nbsp;who work at Town Hall, every effort has been made to understand the working needs of our town workforce and to translate that into a viable plan for moving forward.&Acirc;&nbsp; I have had numerous meetings with &#8220;all&#8221; of the town employees who work at Town Hall; each employee at least twice, and some as many as five times.<\/div>\n<div><\/div>\n<div>Let me be straightforward at this point, to indicate that what has been developed, are conceptual or preliminary plans, that will lead a path forward, with a prelimenary cost analysis for construction and finalization.&Acirc;&nbsp; The drawings to date, are NOT construction documents. Construction Documents would need to be finalized, if, and after, the warrant article for the March 2018 vote is approved for a new Town Hall.&Acirc;&nbsp; After finalization of construction documents, the construction phase can be put out to bid.<\/div>\n<div><\/div>\n<div>Shortly, I will be releasing both the elevation and floor plans for public review and comment.&Acirc;&nbsp; Those comments, or questions, that are received via the email address: &Acirc;&nbsp;<a href=\"mailto:ryetownhalloption3@gmail.com\" target=\"_blank\" rel=\"noopener\">ryetownhalloption3@gmail.com<\/a>, will be answered with the best clarity I can muster.&Acirc;&nbsp; What I do hope to accomplish is to maintain full transparency!&Acirc;&nbsp; Questions and answers, will also be posted on the website:&Acirc;&nbsp;<a href=\"http:\/\/ryetownhalloption3.com\/\" target=\"_blank\" rel=\"noopener\">ryetownhalloption3.com<\/a><\/div>\n<div><\/div>\n<div>Also, please consider, and keep in mind, that as a designer, I cannot possibly meet everyone&#8217;s predilections, desires, nor dreams.&Acirc;&nbsp; What I have tried to accomplish is to design a building that is keeping with New England traditions, and works on this particular site.&Acirc;&nbsp; It is not meant to be a replication of what now exists; rather, timeless New England architecture that will provide a much needed solution to the Town of Rye&#8217;s current needs including: ADA Compliancy, a Health Hazard Free Work Place for our Town Employees, an ergonomically efficient workplace, energy efficiency via heating and cooling, lighting fixtures, insulation, and low maintenance.<\/div>\n<div><\/div>\n<div>By keeping the Town Hall at the current site, we maintain historic continuity of our Town Government location.&Acirc;&nbsp; This is an important site, and one that can be improved.&Acirc;&nbsp; New buildings do not lessen the historic value of the land, rather when properly and assiduously implemented, increase the historic continuity of our heritage.<\/div>\n<div><\/div>\n<div>There will be more information being released in the coming weeks and months, as we strive to bring Article 34 to fruition.<\/div>\n<div><\/div>\n<div>Please stay tuned to the website, where all of the memo&#8217;s are archived and available for review.<\/div>\n<div><\/div>\n<div>Thank you most ernestly, for your consideration,<\/div>\n<div><\/div>\n<div>Regards,<\/div>\n<div><\/div>\n<div>John Loftus<\/div>\n<div>108 Straws Point Road<\/div>\n<div>Rye, NH<\/div>\n<p><\/body><\/html><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Heritage Committee continues to do all it can to raise funds to maintain the building.&Acirc;&nbsp; The BOS is completing construction on the back entrance. Updated Public Safety Building Space:&Acirc;&nbsp;&Acirc;&nbsp;Rye Public Safety Building Available Space Updates on the private design for a new build for Town Hall:&Acirc;&nbsp; Click Here Note from John Loftus: Dear Rye [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-3938","post","type-post","status-publish","format-standard","hentry","category-town-hall-renovations"],"_links":{"self":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/3938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3938"}],"version-history":[{"count":3,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/3938\/revisions"}],"predecessor-version":[{"id":3942,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=\/wp\/v2\/posts\/3938\/revisions\/3942"}],"wp:attachment":[{"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ryecivicleague.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}