1. Â General discussion and review and revision of March minutes (0:00 elapsed)
2. Â Former Commissioner John Murtagh arrives. Â No water main breaks on Ocean Blvd. over the winter. Â One on Harbor Rd. Â The State is going after the bond of Hugo Key, contractor for the water main project, due to some sort of issue. (1:28:02 elapsed)
3. Â Brian Goetz of Portsmouth Water and Sewer Dept. arrives. Â Wright Pierce will be doing a study of water blending between Rye and Portsmouth to determine effects of mixing water of different pH, hardness, total dissolved solids, and alkalinity. Â Discussion of issues arising when Sagamore bridge was out and Rye supplied water to Portsmouth. Â Discussion of existing Portsmouth water treatment plant and potential Rye water treatment plant. (1:44:50 elapsed)
4.  Brian Goetz is unsure whether ten house development on Breakfast Hill  (to be supplied by Portsmouth Water with water from Rye) will proceed.  It appears that a group associated with the Coakley landfill will pay for the cost of the mains.  (2:02:00 elapsed)
5. Â General discussion of new pump shaft and other issues after Mr. Goetz left (2:11:32 elapsed)