Related Articles
1215 Ocean Blvd (Driftwood)
Next Steps: • Design for a second egress; • Need for quantification by floor and overall; • Clarification on DES approval; • Stop sign on Wallis is on the property (discussion on a stop bar); • Renderings of the proposal including street views • Conditions will start but it needs to be known if it […]
RCL Joint ZBA & Planning April 18, 2018
RCL April 16, 2018 joint meeting cell tower Joint Meeting ZBA and Planning Board April 16 A joint meeting was held at the library to a packed room of residents opposed to the cell tower proposal for 120 Brackett Road. The special joint meeting was held to hear the application from Verizon /Cellco to place […]