From the current draft: The Priority Lineup that will go into the Executive Summary are: Note that Water District investments (can be in the millions) are in the appendix and not factored into this list. 1. Dump Truck #109 for adequate snow removal $165,000. 2. Town Hall Building Design (2016) $200,000. 3. Red Mill Road Culvert $150,000. 4. Police […]
Rye Swap Shop Re-opening The Rye Swap Shop will be re-opening on a trial basis Wed. – Fri., 11-2, starting July 7. The purpose of the swap shop is to keep quality items out of the land fill. For a modest fee, the transfer station does accept items NOT allowed in the swap shop, such as […]
RCL Notes: THCworkingGroup091814revBfinal 1. Local builder, Town resident and 2011 Town Hall Space Needs Committee member Joe Tucker presented his case that demolishing the existing Town Hall and building a single replacement building, arguing that the cost would be lower. More Detail 2. Town resident Del Record questions whether or not the Committee […]