Planning Board Chair Memo to the Planning Department:

Next Steps: • Design for a second egress; • Need for quantification by floor and overall; • Clarification on DES approval; • Stop sign on Wallis is on the property (discussion on a stop bar); • Renderings of the proposal including street views • Conditions will start but it needs to be known if it […]
Planning Board meeting Sept 9, 2014 - selected items with time stamps 243 Central Rd (3:38) – Altus engineering representing owner Dan Philbrick proposal to demo existing building and replace with two story building for single or mixed office use; new building would be closer to road with parking in back (3:38) Discussion: 14:00 – Flexibility of […]
RCL Video of November 1st Planning board meeting: Part One:Â Â https://vimeo.com/190034541Â Â Â Part Two:Â Â https://vimeo.com/190041421